icon

Official website of the U.S. government

Skip to main content

Phase down the production and consumption of hydrofluorocarbons (HFCs)

Goal leaders

Elizabeth Shaw

Deputy Assistant Administrator

Office of Air and Radiation (EPA)

To achieve

By September 30, 2023, annual U.S. consumption of HFCs will be 10% below the baseline of 303.9 million metric tons of carbon dioxide equivalent (MMTCO2e) consistent with the HFC phasedown schedule in the American Innovation and Manufacturing (AIM) Act and codified in the implementing regulations. A 10% reduction would decrease the U.S. consumption limit to less than 273.5 MMTCO2e in 2023.